DEMOLITION

Any required Zoning Permits or Drainage Permits must be obtained prior to the start of work

  • If the building is NOT a single-family dwelling, an inspection must be completed for asbestos and all hazardous materials shall be removed by a certified contractor. Certification of asbestos and all hazardous material removal shall be submitted with this Building Permit Application.
  • Submit utility companies’ letters attesting that services are disconnected from the building. Please note that the sanitary sewer will be disconnected and inspected by Easttown Township after the permit is issued and before any demolition is started.
  • Submit a letter outlining how the demolition is to take place and where the demolition materials will be disposed of.
  • Submit a letter from a certified exterminator that the building is inspected and free from rodents.

Show All Answers

1. ADDITIONS, ALTERATIONS, NEW CONSTRUCTION (RESIDENTIAL)
2. DECK CONSTRUCTION (RESIDENTIAL)
3. DEMOLITION
4. FINISHED BASEMENT
5. GEOTHERMAL SYSTEM INSTALLATION
6. SOLAR PANEL INSTALLATION
7. STANDBY GENERATOR
8. SWIMMING POOL CONSTRUCTION