GEOTHERMAL SYSTEM INSTALLATION

Any required Zoning Permits or Drainage Permits must be obtained prior to the start of work

  • Submit two (2) copies of the electrical wiring diagram approved by one of the Approved Electrical Underwriters attached to this Application.
  • Submit two (2) copies of the mechanical system diagram.
  • Submit two (2) copies of the all equipment’s technical specifications.
  • Submit a copy of well permit issued by the Chester County Health Department (CCHD).  If the well is to be drilled prior to this Application, then the Applicant must inform the Township in writing and submit the CCHD Permit.

Show All Answers

1. ADDITIONS, ALTERATIONS, NEW CONSTRUCTION (RESIDENTIAL)
2. DECK CONSTRUCTION (RESIDENTIAL)
3. DEMOLITION
4. FINISHED BASEMENT
5. GEOTHERMAL SYSTEM INSTALLATION
6. SOLAR PANEL INSTALLATION
7. STANDBY GENERATOR
8. SWIMMING POOL CONSTRUCTION