STANDBY GENERATOR

Any required Zoning Permits or Drainage Permits must be obtained prior to the start of work

  • Submit two (2) copies of a diagram of the gas line to be installed, that includes location, size of gas line, and materials to be used.  If using SST gas pipe, then it must be installed per the manufacturer’s specifications.
  • Submit two (2) copies of the electrical wiring diagram approved by one of the Approved Electrical Underwriters attached to this Application.

Show All Answers

1. ADDITIONS, ALTERATIONS, NEW CONSTRUCTION (RESIDENTIAL)
2. DECK CONSTRUCTION (RESIDENTIAL)
3. DEMOLITION
4. FINISHED BASEMENT
5. GEOTHERMAL SYSTEM INSTALLATION
6. SOLAR PANEL INSTALLATION
7. STANDBY GENERATOR
8. SWIMMING POOL CONSTRUCTION